Welcome to
On Feet Nation
Jack Miller Online
khifas Online
Rahul kumar Online
Posted by Jack Miller on March 10, 2025 at 9:08am 0 Comments 0 Likes
Posted by frenzinaomi on March 10, 2025 at 9:07am 0 Comments 0 Likes
Fire Rated Ducting Iraq usually needs to pass through compartment walls or floors that will have a prescribed fire resistance period in terms of the load-bearing capacity, integrity and insulation criteria, for durations of 30 to 240 minutes. It is a requirement that where these compartment walls/floors are penetrated by HVAC ducts or other building services, the fire performance criteria for the penetrated wall or floor are maintained, such that fire in one compartment may not spread to other areas.
© 2025 Created by PH the vintage.
Powered by
You need to be a member of On Feet Nation to add comments!
Join On Feet Nation